The physical interaction layer of space

Matrix™ is a robotic skin that lets space assets touch and interact. They dock, recognise each other, share resources and trade goods and services. Think of it as a robotic PCI cable for space.

One tile: 36 columns, 12 docking sites. A carrier locks between the columns; its site powers it, connects it and can cut it off on its own.

Locked at site 6 · poweredDrag the carrier to take control

Earth from low Earth orbit. Photo: NASA.

Our thesis

Getting to space got cheap. What happens after launch is now the expensive part.

Launch costs have fallen about 20 times since the Shuttle era and SpaceX's fully reusable Starship promises to cut them more than 100 times further. Cheaper access speeds up space innovation and businesses, so more teams fly more hardware, more often.

When access is cheap, what becomes valuable changes:

Staying relevant

Swapping parts easily, on the ground before launch or in orbit after it. From one-off missions to mass-produced constellations, the freedom to change components late keeps hardware useful for longer.

Interacting

Meeting other assets in orbit to trade goods and services: refuelling, upgrades, cargo, repair and orbital transfer. Every asset can be both a customer and a supplier, and the more assets that can touch, the more each one is worth.

Sources: CSIS, launch cost per kg to low Earth orbit, Space Shuttle and Falcon 9; SpaceX, Starship target of about $2 million per launch for 100+ tonnes to low Earth orbit.

The problem and solution

Satellites can talk to each other. They still can't hand each other anything.

Many agencies, primes and startups build their own docking interface, and no standard exists yet. That is the bottleneck in-space servicing, logistics and manufacturing hit today, not a problem for later: servicers need clients, and clients need servicers, so waiting for a standard stalls everyone. Matrix™ doesn't wait. It adapts to the interfaces that exist.

Keep your interface

Your hardware rides on a carrier, the Mover. Its underside is standard (lock, contacts, identity); its top is matched to your hardware and converts your native power rails and data link to the site. Flight-proven hardware stays as it is.

Any asset, either side

Spacecraft, servicers, tugs, stations, depots and rovers can each carry a Matrix™ skin and a carrier. Goods move as modules on carriers (hardware, tank modules, cargo); services start from the same lock.

One skin, every exchange: pick a use case

Hardware modulesConfiguration 1

A servicer delivers a new module. It docks on a free site and powers up.

DOCKING AXISSPACECRAFTMATRIX™ SKINSERVICERCARRIERcompute moduleApproachLockRecogniseTransfer: compute moduleMetered, undock

Scenes with a visiting vehicle (servicer, tanker, tug, cargo or return vehicle) also need that vehicle to berth or be captured. MagnetMode demonstrates berthing and capture first on GroupSat-α in 2029.

Products

Two configurations

Start with a two-tile face that docks and moves hardware, and scale up tile by tile. Add the arm when the mission needs to reach, capture or repair.

Configuration 1

Matrix™ Tile

A breadboard for space hardware: a 96.96 mm tile with 12 docking sites. Each module rides on its own carrier, which the tile can move to another site.

  • Lock, power, data and isolation at every site
  • A fault stays at its own site
  • Starts as a two-tile face and scales up: tiles join edge to edge into faces as large as your spacecraft allows

Built for multi-module spacecraft, hosting platforms and station decks.

Table 1. Configuration 1, key parameters

Parameter
Value
Tile
96.96 × 96.96 mm
Scale
From two tiles up; add tiles as needed
Docking sites
12 per tile
At every site
Lock, power, data and isolation
Relocation
Carriers move between sites
Request information
Configuration 2

Matrix™ Tile + Arm

A robotic PCI cable for space: everything in the Tile, plus a 5-DOF robotic arm on a carrier that travels across the face and reaches beyond its edge.

  • Works autonomously: grasps, berths and hands over on its own
  • One arm serves every site
  • Hands modules on and off the face
  • Captures and berths visiting vehicles

Built for servicers, tugs, stations, depots and in-space factories.

Table 2. Configuration 2, key parameters

Parameter
Value
Base
Everything in Matrix™ Tile
Arm
5-DOF, on a carrier, serves every site
Reach
Beyond the face edge
Autonomy
Grasps, berths and hands over on its own
Berthing
Captures visiting vehicles, first shown on GroupSat-α (2029)
Request information

Every touch runs the same five steps: move, lock, recognise, route, meter.

The technology

What's inside the Matrix™ Tile

Five layers in one tile, from the carrier your hardware rides on to the plate that holds it all.

Hover over or tap a layer to see what it does.

Base plate96.96 mm aluminium plate that holds the columns.Tiles join edge to edge into faces of 2 or 6 tiles.Tile electronicsCoil drivers, site limiters, data switch, controller.36 Hall sensors track every carrier; telemetry logs every exchange.Columns36 columns, 16.16 mm apart, a coil in each.They hold the carrier, and move it when it is unlocked.Docking sitesLock position and 12 gold contacts.Each of the 12 sites powers and isolates on its own.CarrierLock, magnets and contacts below; your hardware above.Your hardware keeps its connector; only the carrier changes.
What you get today

Late changes without the rework

Hardware increasingly changes faster than a spacecraft's design, build, test and launch cycle. Every late swap means harness rework, re-integration and slip: engineering paid again and again. Not swapping costs too: you fly hardware that was already out of date on launch day. With Matrix™, a late swap is a carrier change: the harness and the rest of the spacecraft stay untouched.

Your flight-proven hardware stays as it is, a fault stays at its own site, and you can start with a two-tile face and add tiles as the mission grows. Your bus does not change.

Pay-as-you-go pricing

Pay for what flows through it

The tile is priced close to cost. After that, you pay for what you use: each integration, swap or service that runs through it. You pay as your hardware works, so what you spend grows with the value Matrix™ creates for you.

YOUR SPACECRAFTMATRIX™ SKINUSAGE METERIntegration+1Module swap+1Service+1Metered, per use
Timeline

From the bench to orbit

Now

MVP-II, being built: a 6U-format demonstrator with a two-tile Matrix™ (columns at 1.5× scale for printed parts), a carrier, a 5-DOF robotic arm on a linear slide and a 1U module that berths on its side.

2027

Laboratory and breadboard tests: lock under vibration, contacts, routing, and relocation on a gravity-offloaded rig.

2028

A 1U pathfinder hosted on another spacecraft: Matrix™, carrier and test modules in orbit.

2029

GroupSat-α: two MagnetMode 6U CubeSats berth, ground-supervised first and then autonomously, and exchange hardware.

The 2029 mission concept: two GroupSat-α CubeSats berth on orbit and exchange goods. Watch on YouTube
FAQs

Common questions

How do two assets get close enough to dock?

The visiting vehicle's own navigation brings it close, as today. Matrix™ takes over at contact; with the arm, the visitor only has to hold station within reach.

Do I have to redesign my hardware?

In most cases, no. A carrier adapts your existing interface, so your flight-proven hardware stays as it is and only the top of the carrier is matched to it. If your hardware has unusual mounting, power or data needs, we work out the fit with you early.

What if one docking standard does win?

It becomes one more carrier.

Does a late swap skip re-testing?

No. A swap after the system vibration test is a configuration change, and the launch provider decides on any retest. What Matrix™ saves is harness rework and re-integration.

What happens while a module moves?

Its carrier unlocks to a glide state, stays captive under the column heads and is unpowered until it locks again. The other modules keep running.

Has it flown?

Not yet. The laboratory tile is designed down to board level and goes into test from December 2026. A pathfinder flies in 2028 and GroupSat-α in 2029.

Contact us

Antennas made satellites talk. Matrix™ lets them touch.

Building a spacecraft, station, servicer, tug, depot or rover? Tell us what has to meet what.

contact@mgma.space